Title 24 Energy Code for a New Home in California: Heat Pumps, Solar and All-Electric Choices on the Central Coast

Planning guide · updated October 2026

If you apply for a building permit for a new house in California today, the plans have to meet the 2025 Energy Code, part of Title 24. It changes more than insulation: heat pumps are now the starting point for heating and hot water, solar is still required, larger electrical services must be ready for a battery, and gas appliances bring their own wiring rules. Here is what the code asks for on a new home, how climate zones on the Central Coast change it, and what we settle during design. Questions? Call 805-712-8993.

Open dining and living area with a linear fireplace and glass doors to a covered patio in a Modern Ranch home in Templeton, built by Harrod Built
Pictured: our Modern Ranch in Templeton, a new custom home in Climate Zone 4 by ZIP code. We show it as an example of our new-home work, not as a 2025 Energy Code case study.

The short answer

For permit applications filed on or after January 1, 2026, a new single-family home must meet the 2025 California Energy Code. Its prescriptive path assumes a heat pump for space heating and a heat pump water heater, requires solar PV sized to the home and climate zone, and asks for battery-ready wiring on services over 125 amps. Gas or propane is still possible through the performance path, with electric-ready circuits. Call 805-712-8993.

1. Which code applies

The permit date decides the code

The California Energy Commission (CEC) writes the Building Energy Efficiency Standards, Title 24, Part 6. Its 2025 Energy Code page says buildings whose permit applications are applied for on or after January 1, 2026 must comply with the 2025 Energy Code. A plan set drawn under the 2022 code but submitted this year has to be updated before plan check.

The CEC does not issue permits. The city or county building department enforces Title 24 as a whole, including the Energy Code. In unincorporated San Luis Obispo County, Section 19.01.040 adopts the 2025 edition of Title 24, Part 6 included, along with the County’s local amendments. Every city does the same through its own ordinance, so the first step is always to confirm who has jurisdiction. Our SLO County building permits guide explains how to tell.

The same rule applies after a disaster. The CEC’s 2025 Single-Family Residential Compliance Manual says a home destroyed or damaged by a natural disaster must meet the Energy Code in effect when the permit is applied for, for the parts being rebuilt. Our wildfire rebuild guide covers the rest of that process (we confirm per lot).

2. Climate zones

Where the lot sits changes the details

California is split into 16 building climate zones, and many Energy Code requirements depend on the zone. The CEC’s climate zone tools include a ZIP code list. Across our three counties, the list puts most of the area in four zones:

Area (sample ZIP codes)Climate zone on the CEC ZIP list
North County inland: Paso Robles 93446, Templeton 93465, Atascadero 93422, Santa Margarita 93453, Creston 93432, San Miguel 93451, Shandon 934614
SLO coast and South County: San Luis Obispo 93401/93405, Los Osos 93402, Morro Bay 93442, Cayucos 93430, Cambria 93428, Avila Beach 93424, Pismo Beach 93449, Arroyo Grande 93420, Nipomo 934445
Santa Ynez Valley: Solvang 93463, Santa Ynez 93460, Los Olivos 934415
Santa Barbara South Coast: Santa Barbara 93110/93111, Montecito 93108, Goleta 93117, Carpinteria 930136
Monterey Peninsula and Big Sur: Carmel 93923, Carmel Valley 93924, Monterey 93940, Big Sur 939203

From the California Energy Commission’s Building Climate Zones by ZIP Code list, read October 15, 2026. A ZIP code can contain more than one climate region; the local building department can assign one zone to the whole ZIP code, and the energy consultant confirms the zone for the parcel (we confirm per lot).

A few examples of what changes with the zone:

  • Roof deck insulation in Climate Zone 4. A newly built attic over conditioned space in Zones 4 and 8 through 16 needs insulation at the roof deck, unless the air handler and ducts are inside conditioned space or the system is ductless. That covers most new homes in Paso Robles, Templeton and Atascadero, so we decide early whether ducts go in the attic or inside the house.
  • Windows. The prescriptive maximum window U-factor dropped to 0.27 in Zones 1 through 5, which includes the SLO County and Monterey Peninsula zones above. Zone 6 on the Santa Barbara South Coast stays at 0.30.
  • Solar size. The solar formula uses a different factor for each zone, covered in section 5.

We work across Paso Robles, Templeton, Atascadero, San Luis Obispo, Arroyo Grande, Nipomo and the coast, plus the Santa Ynez Valley, Montecito and Carmel-by-the-Sea, so we check the zone for every parcel rather than assume it (we confirm per lot).

3. Heat pumps

The new baseline for heating and hot water

The CEC calls it the biggest change of this code cycle for single-family homes: a single fuel baseline, with heat pumps prescriptively required for both space heating and water heating. What that means in practice:

  • Space heating. On the prescriptive path, the main heating system must be a heat pump in every climate zone. Electric resistance or electric radiant heat cannot be the primary system. A small independent heater, such as one in a bathroom, is allowed if it is under 2 kilowatts and on a timer of 30 minutes or less.
  • Water heating. The prescriptive path offers three options: a 240-volt heat pump water heater with the tank in the garage or conditioned space; a 240-volt heat pump water heater that meets the NEEA Advanced Water Heater Specification Tier 3 or higher; or a solar water heating system with electric backup and a solar savings fraction of at least 0.7. The extra compact-distribution or drain water heat recovery measures apply only in Zones 1 and 16, not on the Central Coast. Details are in the CEC’s water heating chapter.
  • Backup heat controls. Heat pumps with electric resistance or gas backup need controls that keep the backup heat off above 35°F outdoors except during defrost or emergency use, and a thermostat that shows the outdoor temperature and when backup heat is running.
  • Testing. Refrigerant charge verification is now required for heat pumps in all climate zones, typically checked by a third-party rater.

Heat pump water heaters take up more room than a tankless gas unit and need airflow, so the location belongs on the floor plan, not in a change order. Ducted or ductless, the heating system also drives the attic and roof deck decisions above.

4. Gas, propane or all-electric

What the state requires and what cities add

The 2025 Energy Code does not ban gas in a new single-family home. A home can use gas or propane appliances if it complies through the performance approach, where approved software compares the proposed house to an energy budget measured in long-term system cost. Efficiency upgrades elsewhere, such as better windows, insulation or a larger solar system, make up the difference.

If you install gas or propane equipment in a new home, the electric-ready rules in Chapter 10 (Electric Ready Requirements) apply to each appliance:

  • Water heater. A designated space for a future heat pump water heater, plus either a 120/240-volt, 30-amp-rated circuit to a receptacle within 3 feet of the water heater, or a dedicated 240-volt, 30-amp circuit, with panel space labeled for future 240V use.
  • Furnace. A 240-volt, 30-amp circuit and reserved double-pole breaker space.
  • Range or cooktop. A 240-volt, 50-amp circuit and reserved breaker space.
  • Clothes dryer. A 240-volt, 30-amp circuit and reserved breaker space.

These rules apply to newly built homes only, and they do not apply where the electric version of the appliance is installed.

Rural lots. Many North County parcels have no natural gas line at all, so the real choice is propane or all-electric. Our buying land to build guide and rural acreage guide cover utility questions to settle before you buy.

City of San Luis Obispo. The City’s Municipal Code Section 8.11.040 requires newly constructed buildings to be all-electric. The City paused enforcement of that requirement in 2023 after a Ninth Circuit ruling against a similar Berkeley ordinance, and its notice warned that mixed-fuel projects could have to switch to all-electric if the ruling were overturned. The City’s Clean Energy Program page says the City adopted a new buildings energy efficiency reach code, in effect January 1, 2024, that allows mixed-fuel buildings with added efficiency measures.

Other local rules. Cities and counties that want energy rules stricter than the state code must apply to the CEC. As of October 15, 2026, the CEC’s list of approved local ordinances under the 2025 code did not include any city or county in San Luis Obispo, Santa Barbara or Monterey County. Local amendments to other parts of the building code can still matter, so we confirm the current rules with the city or County for each project (we confirm per lot).

5. Solar and batteries

Solar is required; a battery is optional but the wiring is not

Under the prescriptive rules in Chapter 7 of the compliance manual, every newly constructed single-family home needs a solar PV system unless an exception applies. The minimum size comes from the conditioned floor area, the number of dwelling units and two climate zone factors:

Climate zoneFactor A (floor area)Factor B (each dwelling unit)Worked example: one 3,000 sq ft home
3 (Monterey Peninsula)0.6281.12about 3.0 kWdc
4 (North County inland)0.5861.21about 3.0 kWdc
5 (SLO coast, Santa Ynez Valley)0.5851.06about 2.8 kWdc
6 (Santa Barbara South Coast)0.5941.23about 3.0 kWdc

Factors from Table 7-1 of the CEC 2025 Single-Family Residential Compliance Manual. Formula: conditioned floor area × A ÷ 1,000, plus the number of dwelling units × B. This is the code minimum before any roof-area limit or battery reduction; owners can choose a larger system.

  • Roof limits. The requirement can be reduced to what fits on the solar access roof area: roof with at least 70 percent annual solar access, after fire code pathways and setbacks. Steep roof planes facing generally north (between 300 and 90 degrees from true north) are excluded, and a roof area under 80 contiguous square feet needs no panels. If the result is under 1.8 kWdc, no PV is required.
  • Battery credit. The formula-based size may be reduced by 25 percent if a qualifying battery with at least 7.5 kWh of compliance cycling capacity is installed.
  • Fire access. The residential code requires two 36-inch pathways from the lowest roof edge to the ridge on each roof plane with panels, and keeps arrays below the ridge, so roof shape affects how much fits.
  • Detached buildings. A new conditioned pool house, studio or detached ADU also falls under the solar requirement. An ADU built as an addition to the house does not.

Battery-ready wiring. A new one- or two-unit home with electrical service larger than 125 amps must be ready for a future battery unless one is installed. That means either battery-ready interconnection equipment with at least 60 amps of backed-up capacity, or a 1-inch raceway from the main service to a subpanel for backed-up loads; at least four identified backup circuits, including the refrigerator, a lighting circuit near the main exit and a bedroom receptacle; a main panel busbar rated at least 225 amps; and room for a transfer switch within 3 feet of the main panel.

Solar-ready roof zones apply only to homes without PV in subdivisions of 10 or more homes, so most custom homes on their own lot simply install the system. If you add rooftop solar later, the County’s Chapter 19.09 sets an expedited permit path for small residential rooftop systems (we confirm per lot).

6. Walls, windows and fresh air

Envelope and ventilation changes

  • Wall insulation. The mandatory minimum went from R-13 to R-15 in 2×4 wood walls and from R-20 to R-21 in 2×6 walls.
  • Windows and skylights. The mandatory area-weighted U-factor is now 0.40 or lower. Windows in a fire hazard severity zone or wildland-urban interface area designated by the local agency are excepted from the mandatory window requirements, which matters because wildfire rules set their own glazing requirements. Our guide to building in a fire hazard severity zone covers those materials rules.
  • Insulation quality. The prescriptive package calls for Quality Insulation Installation in all climate zones, checked by a third-party rater before the drywall goes up.
  • Cathedral ceilings. A new prescriptive option allows cathedral ceilings with at least R-38 insulation in every climate zone.
  • Ventilation. Whole-house mechanical ventilation rates were revised, and filters, heat or energy recovery cores and outdoor air intakes have to be reachable for service. Heat or energy recovery ventilators need a fault indicator display that a rater verifies.

On the performance path, the software also caps peak cooling energy between 4 and 9 p.m. at 120 percent of the standard design. In hot inland valleys, west-facing glass and shading can decide whether a design passes, so we look at orientation and overhangs early.

7. Paperwork and inspections

Who signs what, and when

Energy compliance runs through three sets of forms. The certificate of compliance (CF1R) is prepared with the permit plans, usually by an energy consultant using approved software. Installers sign certificates of installation (CF2R) during construction. Where field testing is required, a third-party rater completes certificates of verification (CF3R). The CEC’s Energy Code Compliance (ECC) Program replaced the old HERS program for this testing; ECC-Raters check items such as duct leakage, refrigerant charge and insulation installation.

Because the CF1R lists the exact equipment, window values and insulation levels the house was approved with, changes during construction can mean revised forms. We lock in heating, water heating and window choices before plan check to keep that from slowing the job.

8. County green building rules

An extra checklist for larger homes in unincorporated SLO County

On top of CALGreen (Title 24, Part 11), County Code Section 19.08.040 adds two residential standards in the unincorporated County:

  • New homes over 2,500 square feet must include a green building checklist on the plans, either GreenPoint Rated with at least 75 points or LEED for Homes with at least 40 points. Third-party inspection or certification is not required, and the checklist does not have to exceed the Energy Code. At construction, the architect or engineer of record provides a letter confirming the points.
  • Outdoor fireplaces and heaters connected to gas, propane or electricity must be on mechanical timers limited to four hours, except portable propane heaters with tanks of five gallons or less.

Cities set their own green building amendments, so a home inside city limits may have a different list (we confirm per lot).

9. Remodels and additions

Not every rule follows you into an existing house

Several new-home requirements stop at the property line of new construction. Per the CEC’s additions and alterations chapter, solar PV requirements do not apply to additions or alterations, and the electric-ready rules apply only to newly constructed homes. Additions still meet insulation, window, duct and equipment rules. Our second-story guide and ADU rules guide cover those projects in more detail.

10. Before you design

Our energy checklist for a new home

  1. Confirm the jurisdiction and the date you expect to submit for permit; that sets the code edition.
  2. Look up the climate zone for the parcel, and ask the building department if the ZIP code is split.
  3. Decide gas, propane or all-electric early, and check any city rule on new gas service.
  4. Pick the heating system type and where ducts will run, which settles the roof deck insulation question in Zone 4.
  5. Place the heat pump water heater on the plan with room and airflow.
  6. Size the electrical service, and plan the battery-ready subpanel or interconnection equipment.
  7. Design roof planes with solar access and fire pathways in mind.
  8. Choose window values, glazing area and shading for the orientation.
  9. For homes over 2,500 square feet in the unincorporated County, choose GreenPoint Rated or LEED for the checklist.
  10. Book the energy consultant and ECC-Rater early so testing does not hold up final inspection.

How we help

Energy code planning with us

  • Design that passes plan check. Sister studio Harrod Drafting & Design draws the plans and works with the energy consultant, so heating, water heating, solar and windows are set before submittal.
  • One team from plans to final. Our design-build process keeps design, budget and the Energy Code choices in one conversation.
  • Testing on schedule. We coordinate installers, ECC-Raters and inspections so the forms match the house.
  • Outside, too. Sister company Paso Robles Landscaping handles landscape and hardscape once the house is built.

Harrod Built is a family general contractor (CSLB #986950) based in Paso Robles. See our process, our custom home cost guide and build timeline guide, and the San Luis Obispo County, Monterey County and Santa Barbara County hubs. You can verify any contractor with the CSLB license check.

Planning a new home and not sure which energy path fits? Send us the address, the rough size and whether you want gas, propane or all-electric. We will tell you which climate zone and local rules we expect to apply and what that means for the plans before you commit to a design. Call 805-712-8993 or contact us.

Sources: California Energy Commission 2025 Energy Code page; 2025 Single-Family Residential Compliance Manual (CEC-400-2025-005, June 2025), Chapters 1 (Introduction), 2 (Compliance and Enforcement), 3 (Building Envelope), 4 (HVAC), 5 (Water Heating), 7 (Solar Photovoltaic and Battery Energy Storage Systems), 9 (Additions, Alterations and Repairs) and 10 (Electric Ready Requirements), plus Appendix B (Climate Zones); CEC Building Climate Zones by ZIP Code list and climate zone tools page; CEC Local Ordinances Exceeding the 2025 Energy Code page; CEC Energy Code Compliance Program page; City of San Luis Obispo Municipal Code Section 8.11.040, City News Center notice on the all-electric rule and Clean Energy Program page; San Luis Obispo County Code Sections 19.01.040 and 19.08.040 and Chapter 19.09, read from the County’s official Municode library; California Building Standards Commission codes page. All checked October 15, 2026. This guide is general information, not legal or engineering advice. Cities and counties set local amendments, and we confirm current requirements for each lot.

FAQ

Common questions

Something else on your mind? Call Michael at 805.712.8993.

Does a new home in California have to be all-electric?

Not under the state Energy Code. The 2025 code makes heat pumps the prescriptive baseline, but a home can use gas or propane if it meets the energy budget through the performance approach and includes electric-ready circuits for each gas appliance. Some cities have their own rules; the City of San Luis Obispo’s all-electric requirement is on the books with enforcement paused in 2023.

When does the 2025 Energy Code apply?

To buildings whose permit applications are filed on or after January 1, 2026, according to the California Energy Commission. Plans prepared under the 2022 code need to be updated if they are submitted now.

Are solar panels required on a new house?

Yes, for newly constructed single-family homes unless an exception applies. The minimum size depends on floor area, climate zone and usable roof area, and it can be reduced by 25 percent with a qualifying battery. Additions and alterations do not trigger the solar requirement.

Is a battery required on a new home?

A battery is not required, but a new one- or two-unit home with service over 125 amps must be battery-ready: backup circuits identified, a 225-amp-rated main panel busbar, a raceway or interconnection equipment, and space for a transfer switch. Those rules do not apply if a battery is installed.

What climate zone is Paso Robles in?

The CEC ZIP code list puts Paso Robles (93446), Templeton and Atascadero in Climate Zone 4, while San Luis Obispo and the SLO coast are in Zone 5. A ZIP code can span zones, so the energy consultant confirms the zone for each parcel.

Planning guides

Budget and planning guides

Start your project

Planning a new home? Tell us about the lot.

A few details help us call you back with useful answers about budget, schedule and permits.

805.712.8993

michael@harrodbuilt.com
1345 Riverside Ave, Paso Robles, CA 93446
CSLB License #986950

    Prefer to talk? Call 805-712-8993.