Cupertino sits at the foot of the Santa Cruz Mountains between Saratoga, Los Altos and Sunnyvale. Most of the city is zoned for single-family homes under its R1 Ordinance, with a hillside ordinance for the slopes to the west. A lot of the custom building here is replacement: an older ranch house comes down and a new one-story or two-story home goes up on the same lot. Below is how we plan new homes in Cupertino so the zoning path, the trees and the construction schedule are understood before the drawings are locked.
Harrod Built takes on new custom homes and whole-home rebuilds in the South Bay and on the Peninsula, including Cupertino. Have a Cupertino lot, a tear-down or a plan set ready for an estimate? Phone 805-712-8993 or use the form at the bottom of this page.

The short answer
In the City of Cupertino, a new house on an R1 lot is checked against the R1 Ordinance. A new one-story home that needs no exception or variance can go straight to the Building Division for a building permit. A new two-story home needs a planning application first, with a posted notice board and public comment, and design review by the City’s consulting architect when the second floor is large or close to the side lines. Hillside lots follow the Residential Hillside ordinance, protected trees need a removal permit, and Santa Clara County Fire reviews new construction. (we confirm per lot)
1. Who reviews what
A city with Planning, Building and County Fire
Cupertino’s Community Development Department houses the Planning Division page and the Building Division page, which provides plan reviews, permits, field inspections and public information for new construction. Other agencies handle the rest:
| Agency or office | Its part in a new Cupertino house |
|---|---|
| Planning Division | R1 and hillside zoning checks, the planning permits a two-story house or an exception needs, neighbor noticing, tree removal permits and the Design Review Committee or Planning Commission when a hearing is required. |
| City consulting architect | Design review of two-story houses whose second floor is large relative to the first or sits closer to the side property lines, against the design principles in the R1 Ordinance. |
| Building Division | Plan review, building permits and field inspections for new construction, with electronic submittal through the Permit Center. |
| Public Works | Encroachment and right-of-way permits, street trees, grading and stormwater conditions tied to frontage work. |
| Santa Clara County Fire Department | Fire plan review for new construction and wildfire guidance for lots in a designated fire hazard severity zone. |
| Environmental Programs | Construction and demolition waste, stormwater and water-efficient landscape requirements that ride along with a new house. |
Summarized from City of Cupertino Building, Planning, residential planning, green development and Public Works pages and from Santa Clara County Fire, read November 5, 2026.
We confirm the zoning district and pull the City’s records for the lot before anything else. Our Atherton and Peninsula custom home page describes the kind of homes we take on on the Peninsula; next door, our Saratoga permit guide and Los Altos permit guide cover neighboring cities with their own review boards. (we confirm per lot)
2. The R1 districts
Which single-family district the lot is in
The City’s single-family residential page explains that R1 districts are meant to keep light, air and privacy for each parcel and a compatible scale of houses within a neighborhood. All R1 parcels have to be built under the R1 Ordinance, and several variants carry their own rules:
- Standard R1. The base single-family district, where the number in the zoning name sets the minimum lot area.
- Single-story overlay. Neighborhoods where residents chose to limit new houses to one story and a lower height.
- Eichler district. A small area with its own Eichler design requirements and a design handbook prepared with residents.
- Semi-rural district. An area with modified regulations for semi-rural development.
- Cluster district. A district that trades street improvements for conserved natural features and shared open space.
The zoning code and planning maps page has the code and planning maps. Recorded easements in a title report or parcel map can widen setbacks beyond the ordinance, so we read title before drawing the footprint. (we confirm per lot)
3. One story or two
Why the number of floors changes the permit path
The City’s one-story homes page explains that a new single-story home that needs no exception or variance from the R1 Ordinance does not need a planning permit and can be submitted directly to the Building Division. Some conditions trigger a Minor Residential Permit with neighborhood noticing, such as rear-yard encroachments, taller gable ends or second-story decks. The City’s guidelines for one-story homes favor living space closer to the street, garages set back, modest curb cuts, roof overhangs and porches.
A new two-story home is different. The two-story homes page explains that it needs the R1 and two-story application, a notice board posted on site during the public comment period, and design review when the second floor is large relative to the first or sits close to the side property lines. That review is done by the City’s consulting architect against the design principles in the R1 Ordinance. The guidelines ask for mass and bulk compatible with the neighborhood, vaulted ceilings rather than tall exterior walls, no long exposed second-story walls, the existing pattern of side setbacks and garage orientation, and aligned doors and windows. Odd-shaped or difficult lots can apply for an exception, decided by the Design Review Committee after neighbor noticing and a public hearing.
We run both a one-story and a two-story concept early when a lot allows it, because the planning path, the neighbor process and the schedule change with that one decision.
4. Hillside lots
The Residential Hillside ordinance
Lots in the hillside zones follow the Residential Hillside ordinance, which the City’s residential hillside development page describes as a way to preserve the natural setting while protecting life and property from natural hazards. Development that meets the ordinance can go through the building permit process; an exception may need a Planning Commission hearing, described on the Planning Commission page.
- Studies first. Hillside projects need studies such as arborist and geotechnical reports before approval, and the City has them peer reviewed by its consultants.
- Floor area by slope. Allowable floor area depends on the net lot area and its average slope, calculated by a civil engineer, with a cap that applies regardless of lot size.
- Setbacks by story. Front, rear and side setbacks step back for upper floors and change on steeper lots.
- Height from natural grade. Building height is measured from natural grade, not from a graded pad.
On a hillside lot we start with the survey, the slope calculation and the geotechnical report, because those set the size of the house before design starts. (we confirm per lot)
5. Trees and landscape
Protected trees on a Cupertino lot
The City’s tree protection and removal page treats every tree as part of the urban forest. Certain classes of trees on private property are protected and can only be removed with a tree removal permit:
- Heritage trees. Trees designated for special aesthetic, cultural or historical value.
- Specimen trees. Listed species above a trunk-size threshold, including native oaks, California buckeye, bigleaf maple, western sycamore and certain cedars.
- Trees required by an approval. Trees that were part of an earlier development or landscape plan.
- Street trees. Trees in the public right-of-way are handled by Public Works and are not to be pruned or removed by owners.
Trees have to be protected during construction, and the City encourages tree management plans. New landscaping follows the residential landscaping page and the water-efficient landscape rules on the green development page, and exterior lighting and glass should respect the bird-safe and dark-sky page. We bring an arborist in before the footprint is set.
6. The building submittal
What Building wants for a new house
The building permits page explains that applications are emailed to the Permit Center with drawings and documents, following the City’s electronic submittal rules. Plans are uploaded as separate landscape sheets named to match the drawing index, and supporting documents go in as their own files:
- Soils report. The geotechnical report that the foundation and drainage design follow.
- Structural and energy calculations. The engineering and Title 24 documents for plan review.
- CALGreen checklist and special inspections. The green building checklist and the special inspection form for work that needs an outside inspection agency.
- Review rounds. Staff send a link to start plan review, and corrections come back in rounds until the set is ready to issue.
The City notes that plan review currently takes longer than normal because of volume, so we plan around that. Forms are on the forms and handouts page; status and inspection scheduling are on the online services page, and the Building Division FAQ answers common questions. Owner-builder questions are covered in our owner-builder comparison.
7. Fire, wildfire and energy
County Fire, hazard zones and the energy code
Cupertino is served by the Santa Clara County Fire Department, which reviews plans for new construction; its fire prevention page covers fire prevention and wildfire guidance.
- Fire hazard zones. The City’s fire hazard severity zone designation page explains that Cupertino adopted the State Fire Marshal’s recommended designations, and that new homes in a designated zone have to meet specific building code standards for exterior materials, roofing and sprinklers, plus fire code vegetation management. Check the address on the State Fire Marshal’s fire hazard severity zone maps as well; our fire hazard severity zone guide explains what a mapped lot means.
- Current codes. The City adopted the 2025 California codes with local amendments, effective for projects submitted on or after January 1, 2026.
- All-electric rule. The Building Division has suspended enforcement of the City’s all-electric requirement for new buildings after a federal court decision, while a replacement ordinance is prepared; we check the current rule when design starts.
The state’s 2025 Energy Code applies to permit applications filed on or after January 1, 2026, and our Title 24 overview explains the energy side of a new house. (we confirm per lot)
8. Construction in Cupertino
Noise rules, inspections and licenses
The City’s noise rules, summarized in the Building Division FAQ, shape when site work can run:
- Daytime work. Grading, construction and demolition may exceed general noise limits during daytime hours when the equipment has proper noise controls.
- Weekends and nights. Grading, demolition, street work and underground utility work near homes is not allowed on weekends, holidays or at night, except as the code allows.
- Inspections. The inspections page explains how inspections are requested, and special inspections are done by an outside agency where the plans call for them.
- Right-of-way work. Driveway aprons, utility trenches and other work in the street need their own permits through the Public Works permit applications page.
- Waste and stormwater. Construction and demolition waste and stormwater controls follow the City’s environmental program requirements.
We build the schedule around the City’s noise rules and inspection process so heavy site work lands when it is allowed.
9. Order of steps
How we usually sequence a Cupertino new home
| Stage | What happens | What usually sets the pace |
|---|---|---|
| Lot research | Survey, zoning district (R1 variant or RHS), title easements, protected trees, the fire hazard designation and utilities. | Surveyor, title and arborist calendars. |
| Concept | A one-story or two-story concept checked against the R1 or RHS standards and the City design guidelines. | How close the design runs to the envelope. |
| Planning permits when they apply | Two-story application with a posted notice board and public comment, consulting-architect design review, a Minor Residential Permit or an exception hearing. | Noticing windows and any hearing calendar. |
| Tree permits | Removal permits for any protected tree, and a tree protection plan for the trees that stay. | Arborist report and Planning review. |
| Building and fire plan review | Electronic submittal of drawings, soils report, structural and energy calculations, the CALGreen checklist and special inspection form; Santa Clara County Fire review. | Correction rounds and consultant turnaround. |
| Demolition and construction | Waste diversion, stormwater controls, inspections and the City noise rules for grading and demolition. | Construction, weather and inspection scheduling. |
A common sequence for a new house or a full rebuild in Cupertino; a hillside lot, an Eichler or single-story overlay district, or an exception can each change it.
Our custom home timeline guide puts design, approvals and construction on one calendar. Neighboring cities handle new houses differently; our guides for Saratoga, Los Altos, Los Altos Hills, Monte Sereno, Los Gatos, Palo Alto, Menlo Park, Atherton, Woodside and Portola Valley and Burlingame cover their rules.
10. Before you design
Questions to answer about your Cupertino lot
- Is the lot inside the City of Cupertino, and is there a current boundary and topographic survey?
- Which zoning district is it in: standard R1, a single-story overlay, the Eichler district, semi-rural, cluster or hillside?
- Do recorded easements on title change the setbacks?
- Will the new house be one story or two, and does a two-story design trigger consulting-architect review?
- Which trees on or near the lot are protected, and which need a removal permit or a protection plan?
- Is the address in a designated fire hazard severity zone?
- On a slope, what do the floor area and setback rules allow once a civil engineer calculates the average slope?
- Is a full new home the cleaner path than trying to keep pieces of the existing house?
Owners who already have an architect send us the drawings and we estimate and build from them; owners starting fresh can have Harrod Drafting & Design, our sister studio, draw the house and the permit set.
How we help
What Harrod Built brings to a Cupertino new home
Harrod Built (CSLB #986950) is a family-run general contractor building on the Peninsula, in the South Bay and on the Central Coast. On a new home or a full rebuild in Cupertino, our role usually covers:
- Lot review first. Zoning district, title easements, trees, slope, fire zone and the planning path, checked before we write an estimate.
- Estimates during design. We estimate the one-story and two-story options while the design is still flexible.
- Demolition lined up early. Utility disconnects, waste diversion and tree protection set before the tear-down date.
- Site work from real plans. Soils recommendations, foundation, drainage and frontage work taken from the engineered set, not allowances.
- Run to the City’s rules. Noise rules, inspections, special inspections and a schedule that respects neighbor noticing.
- Design support. Harrod Drafting & Design can draw the house and the permit set, or we build from your architect’s plans.
- Landscape. Paso Robles Landscaping, our landscape company, handles planting, irrigation and hardscape to the approved landscape plan.
Before hiring any builder, look up the license on the state license lookup; the CSLB’s advice on hiring a contractor and our article on how to check a CSLB license explain what to look for. Nearby we also build in Atherton, Woodside and Portola Valley, Palo Alto, Los Gatos and Saratoga, and farther south in Monterey, San Luis Obispo and Santa Barbara counties, through general contracting or design-build. Our process page walks through the steps from estimate to move-in, and our contract type comparison explains fixed-sum and cost-plus agreements. For the local market, see our page on custom homes in Atherton and the nearby Peninsula towns.
Pricing a new home or a full rebuild in Cupertino? Send the address and any drawings you have. We check the zoning district, the one-story or two-story path, the protected trees, any hillside rules, the fire hazard designation and the submittal package, then send back a written estimate. Phone 805-712-8993 or reach us here.
Sources: City of Cupertino Building Division, building permits, inspections, fire hazard severity zone designation, Building Division FAQ, online services and forms pages; Planning Division, single-family residential, one-story homes, two-story homes, residential hillside development, tree protection and removal, residential landscaping, bird-safe and dark-sky, zoning code and planning maps and planning forms pages; the green development page, Public Works permit applications and the Planning Commission page. Fire sources: Santa Clara County Fire Department home and fire prevention pages. State sources: OSFM fire hazard severity zone maps, the CEC’s 2025 energy standards and the CSLB, all reviewed November 5, 2026. This page is a general overview, not legal or code advice; what applies to a given lot is decided by the City of Cupertino and the other agencies involved.
Who issues building permits in Cupertino?
The City of Cupertino Building Division, through electronic submittal to the Permit Center. Planning reviews zoning first where a planning permit is needed, and Santa Clara County Fire reviews new construction.
Does a new one-story house in Cupertino need a planning permit?
Not if it meets the R1 Ordinance without an exception or variance; it can go directly to the Building Division. Some conditions call for a Minor Residential Permit with neighborhood noticing.
What does a new two-story house need in Cupertino?
The R1 and two-story planning application, a notice board posted during public comment, and design review by the City’s consulting architect when the second floor is large or close to the side property lines.
Which trees are protected in Cupertino?
Heritage trees, specimen trees of listed species above a size threshold, including native oaks, and trees required by an earlier approval. Removing one needs a tree removal permit, and trees must be protected during construction.
What rules apply to hillside lots in Cupertino?
The Residential Hillside ordinance, with floor area tied to net lot area and average slope, setbacks that step back by story, height measured from natural grade, and arborist and geotechnical studies peer reviewed by the City.
Which fire department reviews a Cupertino new home?
Santa Clara County Fire Department. Homes in a designated fire hazard severity zone also have to meet specific building and fire code standards for materials, roofing, sprinklers and vegetation.
Planning guides
Budget and planning guides
Building a new home in Saratoga
Design review, hillside rules, protected trees and the City permit path next door.
Building or remodeling in Los Altos
Design review, the Zoning Administrator, daylight plane, protected trees and the City permit path.
Building a new home in Monte Sereno
Site and architecture review, hillside lots, trees and the fire district in the South Bay hills.
Building or remodeling in Los Gatos
Architecture and Site review, hillside standards and story poles in the South Bay.
Building a new home in Los Altos Hills
Site development review, Fast Track, floor area by slope, story poles, oaks and the Town permit path.
Building or remodeling in Palo Alto
Individual Review for two-story homes, protected trees, flood zones, basements and deconstruction.
Building a new home in Burlingame
Planning Commission design review, hillside overlay, demolition, soils reports and Central County Fire.
How long a custom home takes
Design, approvals, permits and construction laid end to end.
Building a new home in Campbell
R-1 path to Building, New House Determination, protected trees, historic listings and County Fire.
Building a new home in Sunnyvale
Design Review levels, Eichler and heritage guidelines, protected trees and the City’s own fire review.
Building a new home in Almaden
Single-Family House Permit, hillsides, ordinance-size trees, WUI fire rules and the City of San José permit path.
Start your project
Planning a new home in Cupertino? Tell us about your property.
A few details help us call you back with useful answers about budget, schedule and permits.
805.712.8993michael@harrodbuilt.com
1345 Riverside Ave, Paso Robles, CA 93446
CSLB License #986950